Completed projects
| |
 |
 |
|
|
TIETO office premises: 745m2
Date : 06.04.2010 – 25.10.2010
Contractor : ALTACA
Russia, Moscow, Lesnaya street, 11-15, Buisness Center «Belya Ploshad»
Lining cables and installation of luminaries
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Cable lining and anons system installation
Cable lining and fire alarm system installation
Cable lining and gaz firefighting system
Design, manufacture and installation power and switchboards
Project development
Obtainig permission in MosRosTechNadzor organization
Executive documentaion
Starting-up and adjustment works and laboratory electro measurements
Pass the building in MosRosTechNadzor organisation
|
ITELLA office premises: 560м2
Date : 06.06.2010 – 17.11.2010
Contractor : ALTACA
Russia, Moscow, Lesnaya street, 11-15, Buisness Center «Belya Ploshad»
Lining cables and installation of luminaries
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Cable lining and anons system installation
Cable lining and fire alarm system installation
Cable lining and gaz firefighting system
Design, manufacture and installation power and switchboards
Project development
Obtainig permission in MosRosTechNadzor organization
Executive documentaion
Starting-up and adjustment works and laboratory electro measurements
Pass the building in MosRosTechNadzor organisation
|
 |
| |
|
|
|
"Pull and Bear" shop in ARMADA TC: 500м2
Date: 10.10.2010-26.12.2010
ГенContractor: OOO «MEGARON»
Russia, Orenburg, Sharlikskoe highway, 1, ARMADA TC;
Cable tray installing
Lining cables and installation of luminaries
Lining of cables and installation of sockets and switches
Design, manufacture and installation power and switchboards
Low voltage system installation
Executive documentaion
Technical report
Starting-up and adjustment works and laboratory electro measurements
|
Магазин "Stradivarius" в ТЦ "Армада": 375м2
Date: 10.10.2010-26.12.2010
Contractor: OOO «MEGARON»
Russia, Orenburg, Sharlikskoe highway, 1, ARMADA TC;
Cable tray installing
Lining cables and installation of luminaries
Lining of cables and installation of sockets and switches
Design, manufacture and installation power and switchboards
Low voltage system installation
Executive documentaion
Technical report
Starting-up and adjustment works and laboratory electro measurements
|
Reconstruction the first floor of building into trade area: 3840м2
Date: 09.01.2010-20.12.2010
Contractor: ATEK INJ
Russia, Bakuninskaya street, 69/1;
Distribution board installing
Cable lining and lumanaries installation
Cable lining and sockets and switches installation
Cable lining and sockets and automation systems installation
Design manufacture and installation of power and switch boards
Plumbing and HVAC systems installation
Executive documentation
|
 |
| |
|
|
|
"Pull and Bear" shop in MEGAPOLIS TC: 475м2
Date: 01.08.2010-01.10.2010
Contractor: MEGARON
Russia, Moscow, Andropova Avenue, 4-10, MEGAPOLIS TC
Cable tray installing
Cable lining and lumanaries installation
Cable lining and sockets and switches installation
Design manufacture and installation of power and switch boards
Executive documentation
Technical report
Starting-up and adjustment works and laboratory electro measurements of all systems
|
Apple office premises: 705м2
Date : 02.04.2010 – 16.07.2010
Contractor : ALTACA;
Russia, Moscow, Petrovka street, 5, Berlinski Dom Business Center
Cable lining and luminaries installation
Automation of lighting system install
installation
Cable tray installation
Design manufacture and installation of power and switch boards
Project development
Executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems всех систем
|
MK3 office premises:1470м2
Date: 02.11.2009-11.02.2010
Contractor:ATEK INJ
Russia, Moscow, Zjamljanoy Val street,11 -19, 10th floor
Cable lining and luminaries installation
Монтаж системы автоматизации освещения
Cable lining and sockets and switches installation
Cable tray installing
Design manufacture and installation of power and switch boards
Project development
Executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
 |
 |
 |
|
|
KALUGA-Russia, Central park Kaluga-shopping center : 41 200 m2
Date : 26.12.2007-31.10.2009
Contractor : «ATEK»
Nebesnaya Street, Kaluga
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation of equipment of fire signallization system
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Lining of cables and installation of equipment of telephones and computerization
Design manufacture and installation of power and switch boards
Design and project
The executive documentation
Starting-up and adjustment works and electro measurements of all systems
|
Klin glass factory, the stage 2 : 18240m2
Date : 12.11.2008-15.03.2009
Contractor : «REALTY STROY»
Moscow, Klin region, Spas-Zalessky settlement
Lining of cables and installation of fixturesLining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design manufacture and installation power and switchboards
The executive documentation
Starting-up and adjustment works And laboratory electro measurements of all systems
Lining of pipes and installation of heating system
Lining of pipes and installation of water supply and the water drainage systems
The executive documentation
Starting-up and adjustment works
|
Office premises «ROCWOOL» : 1 200 m2 Date : 01.11.2008- 15.02.2009
Contractor : «Prizma»
Moscow, Zemlyanoi Val street, 11-19, 10 floor
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of warning
Lining of cables and installation of fire signalization system
Lining of cables for system of automation
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
 |
 |
 |
 |
|
OFFICE CENTER HORUS THE CAPITAL THE CORRIDOR, LADDER FLIGHTS : 2800 m2
Date : 25.08.2008 - 31.12.2008
Contractor : «ALTACA»
Moscow, street 3-th Rybinskaya, 18/1
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
OFFICE CENTER HORUS THE CAPITAL "RESTAURANT" : 1 800 m2
Date : 23.07.2008 - 31.12.2008
Contractor : «ALTACA»
Moscow, street 3-th Rybinskaya, 18/1
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of the warning
Lining of cables and installation fire signalization system
Design, manufacture and installation power and switchboards
Design and project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements
of all systems
|
OFFICE CENTER HORUS THE CAPITAL, OFFICE PREMISES «BAYER»: 12 000 m2
Date : 14.07.2008 - 31.12.2008
Contractor : «АLTACA»
Moscow, street 3-th Rybinskaya, 18/2
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of the warning
Lining of cables and installation fire signalization system
Lining of cables and installation of TV systems
Design, manufacture and installation power and switchboards
Design and project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of
all systems
|
 |
 |
 |
Office premises «JTI» : 6 100 m2
Date : 20.08.2009-30.11.2008
Contractor : «АLTACA»
Moscow, Zemlyanoi Val street, 11-19, 10th floor
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design, manufacture and installation power and switchboards
The executive documentation
Starting up and adjustment works And laboratory Starting-electro measurements of all systems
Lining of pipes and installation of water supply and the water drainage systems
The executive documentation
Starting-up and adjustment works
|
Office premises «DELL» : 1 200 m2
Date : 03.11.2008 - 28.10.2008
Contractor : «МERCURY»
Moscow, the Leningrad highway No.11, 9th floor
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design manufacture and installation power and switchboards
Design and project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all
systems
The executive documentation
Starting-up and adjustment works
|
Оffice center «RENESANS CAPITAL» - an exchange hall « : 12 000m2
Date : 23.10.2007 - 15.05.2008
Contractor : «ENKA INSHAAT»
Moscow, Krasnopresnenskaja quay street, 18
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of
all systems
The executive documentation
Starting-up and adjustment works
|
 |
 |
 |
|
Shopping center «ALARM»: 9100m2
Date : 13.12.2007 - 15.02.2008
Contractor : «TERON»
Moscow , Altyfievskoe highway, 18A
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables and installation fire signalization system
Design manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of
all systems
|
Business center «SILVER-CITY» 6-7-9 floors : 10 000m2
Date : 05.11.2007 - 31.01.2008
Contractor : «ALTACA»
Moscow, Serebrjanicheskaja quay, д.29, 6 - 7 - 9 этаж
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation fire signalization system
Design manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of
all systems
|
Cafeteria «EUROLUNCH»: 2600m2
Date : 05.11.2007 - 31.01.2008
Contractor : «ALTACA»
Moscow, Serebrjanicheskaja quay, д.29
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation fire signalization system
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
 |
 |
 |
|
Office premises «Coca - Cola» : 3200m2
Date : 17.09.2007 - 25.12.2007
Contractor : «MERCURY»
Moscow, Ivan Franko street 10А,
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation fire signalization system
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
MOSCOW-RUSSIA, LOTTE PLAZA : 75 000 m2
Date : 24.08.2007 - 15.10.2007
Contractor : «LOTTE»
Moscow, Nowinsky Boulvard No.8,10
Installation bus-bar up to 4000А
|
Office premises «Sheuring Plough»: 3 000m2
Date : 05.02.2007 - 05.10.2007
Contractor : «ALTACA»
Moscow, Shabolovskaya street, 10, 2-3 floor
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation fire signalization system
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of
all systems
|
 |
 |
 |
|
Office premises «ТЕLЕ - 2»: 5 000m2
Date : 15.04.2007 - 31.07.2007
Contractor : «ALTACA»
119019, Moscow , Novinsky avenue, 8 - 10, 10th floor
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design, manufacture and installation power and switchboards
The executive documentation
Starting-up and adjustment works And laboratory electro measurements of all systems
Lining of pipes and installation of water supply and the water drainage systems
The executive documentation
Starting-up and adjustment work
|
IKEA Parnassus shopping center St.-Petersburg : 120 000m2
Date : 01.08.2006 - 15.05.2007
Client : «ENERGO-STROY»
Contractor : «RENESANS»
St -Petersburg, intersection of annular highway and Engels avenue
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation fire signalization system
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
MOSCOW-RUSSIA, КARO FILM: 7 000 m2
Date : 02.03.2007 - 15.05.2007
Contractor : «МАG-NET»
Moscow, Sevastopol Avenue, 11е
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation of equipment fire signal system
Lining of cables for system of automation
Design, manufacture and installation of power switchboards
Design and project
|
 |
 |
 |
|
ZAPOROJIE-Ukrain, Water-purifying Constructions : 175 000 m2
Date : 09.11.2006 - 21.04.2007
Contractor : «DOGUSH INSHAAT»
Zaporojie, Kyltyrnaja street, estate №223
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for automation system
Design manufacture and installation of power and switch boards
The executive documentation
Starting-up and adjustment works and electro measurements of all systems
Lining of pipes and installation of equipment of heating system
Lining of pipes and installation of equipment of water supply and
the water drain systemThe executive documentation
Start-up and adjustment works
|
Business the center «CAPITOL» : 25 000m2
Date : 06.06.2006 - 01.04.2007
Contractor : «ENKA INSHAAT»
Moscow, 4th Lesnaya street, 4
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
The executive documentation
Starting-up and adjustment works
|
Moscow-Russia, Shell business center Shell : 4 000 m2
Date : 12.01.2007 - 31.03.2007
Client : SHELL
Contractor : «FUDES»
Moscow, Novinsky Boulvard No.31
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation of equipment fire signal system
Lining of cables and installation of equipment of system of telephones
and computerization
Lining of cables and installation of equipment of TV systems
Lining of cables for system of automation
Design, manufacture and installation of power switchboards
Design and project
|
 |
 |
 |
|
MOSCOW-RUSSIA, Apartment house : 6 000 m2
Date : 09.11.2006 - 31.03.2007
Contractor : «FUDES»
Moscow, Basmany Avenue, 9
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Design, manufacture and installation power and switchboards
Design and project
The executive documentation
Starting-up and adjustment works and electro measurements of all systems
|
Office premises «PSK»: 3500m2
Date : 22.10.2006 - 26.01.2007
Contractor : «INTERKON»
Moscow, Obrycheva Street, д.13а
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Design, manufacture and installation power and switchboards
Design and project
The executive documentation
Starting-up and adjustment works and electro measurements of all systems
|
Network of supermarkets «RAMSTORE» (30 buildings On Russia) : 200 000m2
Date : 01.12.2004 - 30.12.2006
Contractor : «МАG-NET»
Russia
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation fire signalization system
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
 |
 |
 |
KIEV - UKRAINE, Interkontinental Hotel : 24 000 m2
Date : 27.10.2006 - 30.12.2006
Contractor : «BUDMASTER»
Kiev, Bolsaya Jitomirskaya Street , 2А
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation of equipment of fire signallization system
Lining of cables and installation of equipment of TV system
Lining of cables for automation system
Lining of cables and installation of equipment of telephones and computerization
Design manufacture and installation of power and switch boards
Design and project
The executive documentation
Starting-up and adjustment works and electro measurements of all systems
|
UFA-RUSSIA, Glass-factory: 35 000 m2
Date : 8.05.2005 - 12.11.2006
Contractor : «МАG-NET»
г. Ufa, Ufimskiy region, Proizvodstvennaya street, 3
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays and power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of fire signalization system
Lining of cables and installation of equipment of system of installation of telephones and computers
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Design, manufacture and installation of power switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
HARKOW-UKRAINE, Cultural commercial complex: 23 500 m2
Date : 05.06.2006 - 25.12.2007
Client : «Ural Construction »
Harkow, Sumskaya street, 10
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for warning system
Lining of cables and installation of equipment fire signal system
Lining of cables and installation of equipment of TV systems
Lining of cables for system of automation
Lining of cables and installation of equipment of system of telephones and computerization
Design, manufacture and installation power and switchboards
The executive documentation
Starting-up and adjustment works and electro measurements of all systems
|
 |
 |
 |
MOSCOW-RUSSIA Shabolowskaya Business Center: 10 000 m2
Date : 09.04.2006 - 31.08.2006
Client : KAPITAL STROY
Contractor : «ENKA INSHAAT»
Moscow, Shabolowskaya Street, 10
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of fire signal system
Lining of cables and installation of equipment of telephones and computers
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Design, manufacture and installation of power switchboards
Design and project
|
KURSK-RUSSIA, The Elite house : 33 000 m2
Date : 24.12.2004 - 12.06.2006
Contractor : «Quartett»
Kursk, Lisaya Goda Street, 5
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of fire signalization system
Lining of cables and installation of equipment of system of installation of telephones
and Computers
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Design manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements
of all systems
Lining of pipes and installation of equipment of heating system
Manufacture and installation of air ducts
Installation of the equipment of ventilation system
Installation of the equipment of a central air handling units
Installation of the equipment of smoke extraction system
Lining of pipes and installation of equipment of water supply and water drainage system
The executive documentation
Starting-up and adjustment works
|
КIEV, UKRAINE, P&G Factory: 3 500 m2
Date : 22.05.2005 - 12.02.2006
Contractor : «P&G»
Kiev, Zavokzallnaya street, 27
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays and power cables
Lining of cables and installation of equipment of system of installation
of telephones and computers
Design, manufacture and installation of power switchboards
Design and Project
|
 |
 |
 |
|
Office premises «MORE PLAZA» : 1200 m2
Date : 05.06.2005 - 30.12.2005
Contractor : «FUDES»
Moscow, Pavlovskaya street, 27, floor 4
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of automation
Design, manufacture and installation power and switchboards
Design and Project
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
The executive documentation
Starting-up and adjustment works
|
Basmanniya Administration Building : 2 100 m2
Date : 21.04.2005 - 28.09.2005
Client : UKS «Basmanny»
Contractor : «DOGUKAN INSHAAT»
Moscow, Zemlyanoi Val Street, 7/1
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays and power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of fire signal system
Lining of cables and installation of telephones equipment
Lining of cables and installation of equipment of TV system
Design manufacture and installation of power switchboards
Design and projects
|
Moscow-Russia - Central office «Finansbank» : 3 800 m2
Date : 03.07.2004 - 01.02.2005 / 26.05.2005 - 28.09.2005
Contractor : «FUDES»
Moscow , The Warsaw highway, 28А/1
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Installation of generator (diesel) and systems of uninterrupted feed
Installation of grounding system
Design manufacture and installation of power switchboards
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
 |
 |
 |
|
MOSCOW-RUSSIA, Elite Residence : 3 250 m2
Date : 10.04.2005 - 14.09.2005
Client : «OLFIELD»
Contractor : «МАG-NET»
Moscow Area , Istrinsky Region, Novorijoskoe Highway, near Voronino
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays and lining of power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of fire signalization system
Lining of cables and installation of equipment of telephone system
Lining of cables and installation of equipment of TV system
Design, manufacture and installation of power switchboards
Design and Project
|
Moscow-Russia - Apartments of a class «LUX» Group «MONOLIT» : 3 800 m2
800 m2
Date : 18.11.2004 - 20.03.2005
Client : «OLFIELD»
Contractor : «МАG-NET»
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Installation of fire gauges
Installation of external illumination
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
Moscow-Russia - Elite house : 12 000 m2
Date : 11.04.2004 - 01.04.2005
Client : «INGEKOM»
Contractor : «GRM-STROY»
Moscow , Povarskaya street, 28/1-2-3
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of telephones and Computers
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Starting-up and adjustment works and laboratory electro measurements of all systems
Lining of pipes and installation of equipment of heating system
Manufacture and installation of air ducts
Installation of the equipment of ventilation system
Installation of the equipment of central air handling units
Installation of the equipment of smoke extraction system
Lining of pipes and installation of equipment of water supply and water drainage system
The executive documentation
Starting-up and adjustment works
Design manufacture and installation of power switchboards
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
Plaster, painting, wall-paper application
Marble, granite and ceramics work
|
 |
 |
|
MOSCOW-RUSSIA – MKHAT
The Moscow art academic theatre it. Chekhov : 8 000m2
Date : 03.07.2004 - 01.02.2005
Client : «INGEKOM»
Contractor : «GRM-STROY»
Moscow , Kamergersky Avenue, 3А
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of telephones and Computers
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Lining of pipes and installation of equipment of heating system
Manufacture and installation of air ducts
Installation of the equipment of ventilation system
Installation of the equipment of central air handling units
Installation of the equipment of smoke extraction system
Lining of pipes and installation of equipment of water supply and water drainage
system
The executive documentation
Starting-up and adjustment works
Design, manufacture and installation of power switchboards
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
Plaster, painting, wall-paper application
Repair of marble and granite floors
|
Moscow-Russia - Atriland the Childrens entertaining center : 7 200 m2
Date : 08.02.2004 - 08.12.2004
Client : «CiPM»
Contractor : «GRM-STROY»
Auto go-cart racing, cafeteria, restaurants, childrens playgrounds,
Game devices, room of horrors
Moscow , Zemlyanoi Val Street, 33
Lining of cables and installation of fixtures
Lining of cables, installation of sockets, switches and connection Game devices
Installation of cable trays and Lining of power cables
Lining of cables for system of the warning
Lining of cables and installation of equipment of system of installation of telephones
And computers
Lining of cables and installation of equipment of TV system
Design manufacture and installation of power switchboards
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
 |
 |
|
Moscow-Russia - Snow Queen : 6 000 m2
Date : 09.09.2003 - 24.01.2004
Contractor : «ENERGO-STROY»
Shop for leather products
Moscow , Vernadsky avenue, 105
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays of power cables
Lining of cables for system of warning
Lining of cables and installation of equipment o g qp f system of installation of telephones
and computers
Lining of cables for system of video observation
Lining of cables and installation of equipment of TV system
Design manufacture and installation of power switchboards
The executive documentation
Starting-up and adjustment works and laboratory electro measurements of all systems
|
N.NOVGOROD - RUSSIA - Shopping center «Chocolate» : 26 000 m2
Date : 05.06.2003 - 15.03.2004
Contractor : «MYU INSHAAT»
The trading areas, underground parking, cafeterias of fast service, Ramstore, cinema on 4 halls, pool, beauty salon and offices
Nizhni Novgorod, Belinsky Street № 128
Lining of cables and installation of fixtures
Lining of cables and installation of sockets and switches
Installation of cable trays and power cables
Works and laboratory electro measurements of all systems
Lining of cables for system of the warning
Lining of cables and installation of equipment of fire signal system
Lining of cables and installation of equipment of telephones and computers
Lining of cables and installation of equipment of TV system
Lining of cables for system of automation
Design manufacture and installation of power switchboards
Design and projects
The executive documentation
Starting-up and adjustment
|
|